CASE STUDIES

KatCom

Curragh Mine Drain Revegetation

At Queensland’s Curragh Coal Mine, Erizon was engaged by KatCom to restore more than 80,000 m² of disturbed land, stabilising the mine drain and
Advance Bricks & Pavers

Quarry Rehabilitation

Rehabilitation of a former quarry site challenged by highly compacted clay soils and limited topsoil, with the goal of restoring the area to a
railway vegetation
Lycopodium

Malabar Rail Cutting Remediation

Erizon was engaged by Lycopodium to remediate erosion-prone earthwork cuttings along the Antiene Spur rail line by analysing hostile soil conditions and implementing a
hyromulching bfm
Whittens Group

Hydromulching Project for EnergyConnect

Delivery of a tailored hydromulching solution that stabilised exposed earthworks while promoting rapid revegetation on the EnergyConnect project site.
Brimbank Council

Sunshine Energy Park Revegetation

Revegetation of a former basalt quarry and capped landfill, by establishing a robust cover of low-maintenance grasses to stabilise the landfill cap and prevent
WBHO

WBHO Industrial Soil Stabilisation Project

WBHO engaged Erizon to stabilise 5.5 hectares of highly disturbed, nutrient‑deficient soil along Old Cooma Road in New South Wales as part of a
Secret Link

Get in touch

For further information on how Erizon can assist you with your next Revegetation, Dust Suppression or Erosion Control project please call our team directly or complete the form below.

 

Please note we do not service Residential Projects.