CASE STUDIES

railway vegetation
Lycopodium

Malabar Rail Cutting Remediation

Erizon was engaged by Lycopodium to remediate erosion-prone earthwork cuttings along the Antiene Spur rail line by analysing hostile soil conditions and implementing a
Brimbank Council

Sunshine Energy Park Revegetation

Revegetation of a former basalt quarry and capped landfill, by establishing a robust cover of low-maintenance grasses to stabilise the landfill cap and prevent
McMahon Services

Fort Largs Temporary Dust Suppression

Erizon was engaged to deliver a temporary dust suppression solution for a new residential development at Fort Largs in Adelaide, where exposed sandy soils
V/Line

Merbein Railway Cutting Erosion Control

V/Line engaged Erizon to stabilise the Merbein railway cutting in north‑west Victoria after severe wind and water erosion caused drainage blockages, track instability, and
AGL Macquarie

Hunter Valley Ash Dam – Dust Suppression Project

Erizon neutralised the urgent dust threat at AGL Macquarie’s Liddell ash dam, deploying a precision-targeted aerial and ground-based SuppressX solution to stabilise 20.2 hectares
Secret Link

Get in touch

For further information on how Erizon can assist you with your next Revegetation, Dust Suppression or Erosion Control project please call our team directly or complete the form below.

 

Please note we do not service Residential Projects.