CASE STUDIES

V/Line

Merbein Railway Cutting Erosion Control

V/Line engaged Erizon to stabilise the Merbein railway cutting in north‑west Victoria after severe wind and water erosion caused drainage blockages, track instability, and
WBHO

WBHO Industrial Soil Stabilisation Project

WBHO engaged Erizon to stabilise 5.5 hectares of highly disturbed, nutrient‑deficient soil along Old Cooma Road in New South Wales as part of a
Hanson Heidelberg Cement

Kanmantoo Bluestone Quarry- Stockpile Dust Suppression Project

The Kanmantoo Bluestone Quarry required an immediate and durable environmental safeguard.
Hillgrove Resources

Kanmantoo Copper Mine Site Rehabilitation Project

Erizon revitalised 40 hectares of the Kanmantoo Copper Mine in just 10 days, deploying a precision hydromulching solution that anchored native vegetation and neutralised
Flinders Power Station

Port Augusta Ash Dam – Dust Suppression & Revegetation

Erizon neutralised the toxic dust threat at the 180-hectare Port Augusta Ash Dam, establishing a permanent, self-sustaining green ecosystem in 10 days.
AGL Macquarie

Hunter Valley Ash Dam – Dust Suppression Project

Erizon neutralised the urgent dust threat at AGL Macquarie’s Liddell ash dam, deploying a precision-targeted aerial and ground-based SuppressX solution to stabilise 20.2 hectares
Secret Link

Get in touch

For further information on how Erizon can assist you with your next Revegetation, Dust Suppression or Erosion Control project please call our team directly or complete the form below.

 

Please note we do not service Residential Projects.