Project Overview

Revegetation was needed at the Sunshine Energy Park, a former basalt quarry that had previously been used for landfill activities and then capped after closure. This project aims to provide long-term stabilisation of the landfill cap against erosion and dust generation by establishing a cover of low-maintenance grasses.

Initial soil testing of the area revealed a complex soil structure with differing amelioration requirements. The soil contained high clay content, strong alkalinity and salinity in some areas.

 

Chosen Solution

EnviroLoc Hydromulch BFM was our recommended solution for the Sunshine Energy Park Revegetation project. This solution, incorporated with the customised amelioration plan, will provide a healthy growing medium for initial seed germination whilst the amendments enhance the E-horizon of the substrate for a sustainable vegetation result. The EnviroLoc wood fibres will increase moisture retention and maintain surface temperature to support seed germination, along with acting as an erosion control blanket protecting the surface from wind and water erosion.

 

Equipment used

The Erizon team applied the EnviroLoc solution to the area using their flagship HydroRig equipment. These purpose-built trucks have built-in agitators within the holding tanks that consistently mix the product to ensure an even application is applied to the surface area.

 

Scope

The first step was the application of treatment to remove existing weeds, followed by 150mm deep cultivation and amelioration program to prepare the soil for the best chance of grass establishment. Treatment involving the application of gypsum and surface preparation took 2 days to complete. To maximise the chances of success, a three-month wait was required before the application of Hydromulch could take place.

After three months, the climate was optimal to start the revegetation process. The Erizon team successfully applied the EnviroLoc solution over an 8-day period, working in ideal conditions. A 12-month maintenance plan was created to ensure the goal of sustainable vegetation and soil stabilisation is met.

Project photos

Project Videos

Similar projects

KatCom

Curragh Mine Drain Revegetation

At Queensland’s Curragh Coal Mine, Erizon was engaged by KatCom to restore more than 80,000 m² of disturbed land, stabilising the mine drain and
Advance Bricks & Pavers

Quarry Rehabilitation

Rehabilitation of a former quarry site challenged by highly compacted clay soils and limited topsoil, with the goal of restoring the area to a
railway vegetation
Lycopodium

Malabar Rail Cutting Remediation

Erizon was engaged by Lycopodium to remediate erosion-prone earthwork cuttings along the Antiene Spur rail line by analysing hostile soil conditions and implementing a
hyromulching bfm
Whittens Group

Hydromulching Project for EnergyConnect

Delivery of a tailored hydromulching solution that stabilised exposed earthworks while promoting rapid revegetation on the EnergyConnect project site.
McMahon Services

Fort Largs Temporary Dust Suppression

Erizon was engaged to deliver a temporary dust suppression solution for a new residential development at Fort Largs in Adelaide, where exposed sandy soils
V/Line

Merbein Railway Cutting Erosion Control

V/Line engaged Erizon to stabilise the Merbein railway cutting in north‑west Victoria after severe wind and water erosion caused drainage blockages, track instability, and