CASE STUDIES

Hydromulching Project for EnergyConnect

Hydromulching |
EnviroLoc Hydromulching BFM |
Civil Construction

Project Overview

The Whittens Group approached us to hydromulch multiple laydown areas for EnergyConnect in the West of Wagga, New South Wales. The project covered a 35,000m2 area and took three days to install.

Chosen Solution for this project

We utilised our proprietary product EnviroLoc BFM, in conjunction with a site-specific seed mix, binders, and a custom fertiliser blend. Our team applied the product using a Hino T180 HydroRig and two experienced spray technicians, mainly utilising a cannon with very little need for hose work. The Whittens Group provided an all-terrain telehandler and a water tanker for the project.

Scope

Our team delivered on-time and with no problems, meeting all agreed-upon timelines and milestones. We provided regular progress reports to the client throughout the project.

Key Challenges

Conditions were optimal for the three-day period, allowing us to complete the work on time without any issues.

Results

The client was happy with the results, and we are now looking to expand our hydromulching services to more camps in the near future.

Contact us today to learn more about how our hydromulching solutions can benefit your next project!

Project photos

Project Videos

Similar projects

KatCom

Curragh Mine Drain Revegetation

At Queensland’s Curragh Coal Mine, Erizon was engaged by KatCom to restore more than 80,000 m² of disturbed land, stabilising the mine drain and
Advance Bricks & Pavers

Quarry Rehabilitation

Rehabilitation of a former quarry site challenged by highly compacted clay soils and limited topsoil, with the goal of restoring the area to a
railway vegetation
Lycopodium

Malabar Rail Cutting Remediation

Erizon was engaged by Lycopodium to remediate erosion-prone earthwork cuttings along the Antiene Spur rail line by analysing hostile soil conditions and implementing a
Brimbank Council

Sunshine Energy Park Revegetation

Revegetation of a former basalt quarry and capped landfill, by establishing a robust cover of low-maintenance grasses to stabilise the landfill cap and prevent
WBHO

WBHO Industrial Soil Stabilisation Project

WBHO engaged Erizon to stabilise 5.5 hectares of highly disturbed, nutrient‑deficient soil along Old Cooma Road in New South Wales as part of a
Hillgrove Resources

Kanmantoo Copper Mine Site Rehabilitation Project

Erizon revitalised 40 hectares of the Kanmantoo Copper Mine in just 10 days, deploying a precision hydromulching solution that anchored native vegetation and neutralised
Secret Link

Get in touch

For further information on how Erizon can assist you with your next Revegetation, Dust Suppression or Erosion Control project please call our team directly or complete the form below.

 

Please note we do not service Residential Projects.